Monday 28 November 2011
Railway Noise / EuropeTrain

The 10th run of the EuropeTrain starts with the third French Loop via the Netherlands and Belgium

Share this article

After nearly three weeks of intense activity at the DB Systemtechnik test centre, the train started again on 26 November at 09:45 from Minden to Bad Bentheim, crossed the Netherlands and reached Antwerp in the evening. From here the train was transferred to Paris Le Bourget on Sunday 27 November. During the French Loop several cycles are planned from the train’s temporary base in Paris Le Bourget to Lyon (9x), to Metz (2x) and to Marseille (1x). The return trip via Belgium and the Netherlands is planned for mid December.

Pictures and current information on the EuropeTrain project can be found under http://EuropeTrain.uic.org

0 vote